Home >

Hebei Hutuo River Comprehensive Improvement Project

 

Solution: 3D Vegetation Net, Gabion Net

Construction Area: 250,000 square meters

Case Description:

Addressing the landscape improvement and flood control needs of the Hutuo River, we provided 3D vegetation nets for ecological slope protection and greening, and gabion nets for the construction of flood control dikes. Our products not only met the functional requirements of the project but also considered the aesthetic appeal of the urban river, creating a more beautiful waterfront environment for citizens.

page-800-531